Research Article

Two Stop-Line Method for Modern T-Shape Roundabout: Evaluation of Capacity and Optimal Signal Cycle

Table 1

Notations’ variables used in this article.

NotationsDescriptionUnits

Origin or centre of the roundabout
Angle between two radian points
Angle between two radian points of auxiliary queuing lane
Limited vehicles queue before second stop-line from approach xm
Radius of the roundaboutm
No. of possible vehicle’s queue on the approach xm
Average occupied space of a single vehiclem
Left-turning lanes in circulatory roadway for the approach x vehiclesm
No. of vehicles
Capacity of circulatory roadway for left-turn vehiclesPcu/h
Weaving width of circulatory roadwaysm
Entry lane
Exit lane
Signal cycle lengths
Total lost times
Total no. of phases j to k for approach xs
Saturation flow towards circulatory roadway by using phase jPcu/h
Lost time during signal cycles
Total lost time of red light during change cycles
Time to leave vehicle before second stop line (SL) from approach xs
Saturation flow of circulatory roadwayPcu/h
Effective green total time per cycles
Effective green time for approach 1s
Effective green time for approach 2s
Effective green time for approach 3s
Saturation flow rate of straight-going traffic at approach xPcu/h
Traffic flow rate of approach xPcu/h
Green time adjustment of straight-go flow of approach (2, 3)s
Saturation flow rate of straight-go traffic of approach xPcu/h
Width of one circulatory lane of roundaboutm
Green time for straight-go traffic on approach xs
Left-turn vehicle ratio from approach xPcu/h
Saturation flow rate for left-turn vehicles on approach xPcu/h
Limited no. of lanes for left-turn vehicles
Saturation flow of left-turn lane on approach xPcu/h
Green time for left-turn flow before second stop lines
Changing interval between and s
Capacity of one approach directionPcu/h
Total capacity of TLSR-2SLPcu/h
Capacity of first stop-line from approach xPcu/h
Capacity of second SL from approach xPcu/h
No. of straight-going lanes at first SL on approach x
Green time for first SL vehicles at approach xs
Capacity of left-turn vehicles on approach x at first stop-linePcu/h
Green time of left-turn vehicles at first SL on approach xs
No. of left-turn lanes at first SL on approach x
Left-turn flow inside circulatory from approach xPcu/h