Research Article

Two Stop-Line Method for Modern T-Shape Roundabout: Evaluation of Capacity and Optimal Signal Cycle

Table 2

Left-turn capacity analysis of the proposed model.

Signal cycle lengthAimsun simulator benchmark values (Pcu/h)Model without considering internal space areaProposed TLSR-2SL model considering internal space areaImproved ratio of accuracy level by using TLSR-2SL (%)
Results (Pcu/h)Relative error (%)Results (Pcu/h)Relative error (%)

602933043.83054.1−0.4
75413318−23.0375−9.213.9
90406329−19.045913.15.9
105489337−31.14941.0230.1
120523346−33.85382.930.9
135474349−26.44964.621.9
150397351−11.64257.054.6
160426354−16.9404−5.1611.7