Research Article

First-Train Timetable Synchronization in Metro Networks under Origin-Destination Demand Conditions

Table 7

Connection relationships for the connecting lines 1U and 1D in solution (5236686, 99).

Transfer stationOptimized connection relationshipTransfer waiting time (min)Actual connection relationshipTransfer waiting time (min)

14(1, 2D) ⟶ (1, 1D)0(1, 2D) ⟶ (1, 1D)10
(1, 2D) ⟶ (1, 1U)0(1, 2D) ⟶ (2, 1U)3
(1, 2U) ⟶ (2, 1D)0(1, 2U) ⟶ (1, 1D)5
(1, 2U) ⟶ (2, 1U)1(1, 2U) ⟶ (3, 1U)5

15(1, 4D) ⟶ (1, 1D)0(1, 4D) ⟶ (1, 1D)3
(1, 4D) ⟶ (2, 1U)0(1, 4D) ⟶ (3, 1U)0
(1, 4U) ⟶ (1, 1D)1(1, 4U) ⟶ (1, 1D)2
(1, 4U) ⟶ (2, 1U)1(1, 4U) ⟶ (4, 1U)6

18(1, 3D) ⟶ (1, 1D)1(1, 3D) ⟶ (1, 1D)9
(1, 3D) ⟶ (4, 1U)0(1, 3D) ⟶ (5, 1U)3
(1, 3U) ⟶ (1, 1D)13(1, 3U) ⟶ (1, 1D)12
(1, 3U) ⟶ (2, 1U)0(1, 3U) ⟶ (5, 1U)6

23(1, 7U) ⟶ (12, 1U)0(1, 7U) ⟶ (12, 1U)6