Research Article

[Retracted] Topological Sustainability of Crop Water Requirements and Irrigation Scheduling of Some Main Crops Based on the Penman-Monteith Method

Table 12

Rice irrigation schedules, starting from the 25th of November and ending on the 13th of April of the next year.

DateDayStageEta (%)Puddl.Rain (mm)Ks (fract.)Percol.Depl. SM (mm)Net Gift (mm)Loss (mm)Depl. (mm)

25-Nov−19PrePu90Prep00.904191.3040
10-Dec−4Puddl100Prep010490040
14-Dec0Puddl100OK014.9054.304.3
23-Dec9Init100OK4.813.1095.50-4.5
10-Jan27Dev100OK013.10100.400.4
26-Jan43Dev100OK013.1095.30-4.7
9-Feb57Mid100OK013.1095.30-4.7
22-Feb70Mid100OK013.10100.800.8
8-Mar84Mid100OK013.1098.30-1.7
21-Mar97End100OK013.10100.100.1
2-Apr109End013.10100.800.8
13-AprEndEnd21380

Depl.  = Depletion (mm); Percol. = percolation; Ks is the adjustment coefficient for water stress.