Research Article

Fault-Tolerant Control Strategy for Neutral-Point-Clamped Three-Level Inverter

Figure 7

The sequence of voltage vectors and its action times in region I-1. (a) Conventional switching sequence. (b) After is subtracted. (c) After the switching sequence is rearranged.
(a)
(b)
(c)