Research Article
Coordinated Optimization of Departure Time Domains of Multiple Trains at a Station Based on Passenger Satisfaction
Table 1
23 pairs of passenger train information with Chengdu as the starting/terminal station.
| Number | Level | Train-operation section |
| 1 | K | Chengdu–Guiyang | 2 | T | Chengdu–Wuhan | 3 | K | Chengdu–Wuhan | 4 | Z | Chengdu–Wuhan | 5 | T | Chengdu–Xi’an | 6 | K | Chengdu–Xi’an | 7 | K | Chengdu–Lanzhou | 8 | K | Chengdu–Kunming | 9 | Z | Chengdu–Zhengzhou | 10 | K | Chengdu–Zhengzhou | 11 | Z | Chengdu–Guangzhou | 12 | K | Chengdu–Guangzhou | 13 | K | Chengdu–Nanchang | 14 | T | Chengdu–Nanchang | 15 | K | Chengdu–Hangzhou | 16 | K | Chengdu–Changsha | 17 | T | Chengdu–Beijing | 18 | K | Chengdu–Nanjing | 19 | K | Chengdu–Beijing | 20 | Z | Chengdu–Beijing | 21 | K | Chengdu–Shenyang | 22 | K | Chengdu–Shanghai | 23 | T | Chengdu–Changsha |
|
|