Journal of Engineering / 2017 / Article / Fig 2

Research Article

Membrane Fouling and Chemical Cleaning in Three Full-Scale Reverse Osmosis Plants Producing Demineralized Water

Figure 2

Key performance parameters NPD (a) and (b) of plant location II. Vertical lines indicate CIP. Horizontal lines indicate performance with new membranes [day zero]. From this installation, a lead element from the first stage was taken (02.11.2010). Time point of membrane autopsy is indicated with dark grey arrow.
(a)
(b)

Article of the Year Award: Outstanding research contributions of 2020, as selected by our Chief Editors. Read the winning articles.