Journal of Engineering / 2017 / Article / Fig 2

Research Article

Membrane Fouling and Chemical Cleaning in Three Full-Scale Reverse Osmosis Plants Producing Demineralized Water

Figure 2

Key performance parameters NPD (a) and (b) of plant location II. Vertical lines indicate CIP. Horizontal lines indicate performance with new membranes [day zero]. From this installation, a lead element from the first stage was taken (02.11.2010). Time point of membrane autopsy is indicated with dark grey arrow.
(a)
(b)

We are committed to sharing findings related to COVID-19 as quickly as possible. We will be providing unlimited waivers of publication charges for accepted research articles as well as case reports and case series related to COVID-19. Review articles are excluded from this waiver policy. Sign up here as a reviewer to help fast-track new submissions.