Research Article

Determination of Allowance Time by Work Sampling and Heart Rate in Manufacturing Plant in Juárez México

Table 3

(a) Operator “A” percentage of job severity obtained from the work sampling.

Job SeverityHeart RateFrequencyTOT%
Job
Sev.
RWFFWWOBMSWCLGYEDDW

Light<90112304264002430.254
Moderate90-1102283210073501050.622
Heavy110-130001801001010210.124
Very Heavy130-1500000000000000

TOT1691.000

RW: review the working conditions of the stations, FF: full fill process audit sheet, W: working, WO: walk to the cafeteria, B: breakfast, MS: machine shutdowns, WC: bathroom, L: lunch, GY: work calisthenics, ED: end of the day, DW: drink water.
(b) Operator “B” percentage of job severity obtained from the work sampling.

Job SeverityHeart RateFrequencyTOT%
Job
Sev.
RWFFWWOBMSWCLGYEDDW

Light<90114800256043700.37
Moderate90-110107426006330950.51
Heavy110-130121710000001220.12
Very Heavy130-1500000000000000

TOT1871.00

(c) Operator “C” percentage of job severity obtained from the work sampling

Job SeverityHeart RateFrequencyTOT%
Job
Sev.
RWFFWWOBMSWCLGYEDDW

Light<90323503554051630.35
Moderate90-1100183330073411050.57
Heavy110-130001300001100150.08
Very Heavy130-1500000000000000

TOT1831.00

(d) Operator “D” percentage of job severity obtained from the work sampling.

Job SeverityHeart RateFrequencyTOT%
Job
Sev.
RWMCFFWWOBMSWCLGYEDDW

Light<901221524334011470.24
Moderate90-11009007220256211170.60
Heavy110-1302152520013011320.16
Very Heavy130-15000000000000000

TOT1961.00

MC: movements of containers.