Research Article
Performance Evaluation of an Existing Renewable Energy System at Gilutongan Island, Cebu, Philippines
Table 7
Simulation results of the techno-economic analysis.
| System Configurations | Electrical production (kWh/yr) | Excess energy (kWh/yr) | Net present cost (NPC) (US$) | Levelized cost of energy (LCOE) (US$/kWh) | Payback period (year) |
| | 6,510 | 1,570 | 16,588.75 | 0.271 | 2.49 | 13,020 | 8,020 | 21,223.73 | 0.346 | 3.60 |
|
|