Research Article
Multiobjective Optimization Methods for Congestion Management in Deregulated Power Systems
Table 2
Simulated case for IEEE 30 bus system.
| Cases | Lines overloaded | Line limit | Actual power flow | Power violation | Total power violation | Severity index |
| A | 1–3 | 130 | 315.26 | 185.26 | 386.7 | 12.96 | 3-4 | 130 | 268.29 | 138.29 | 4–6 | 90 | 153.16 | 63.160 |
| B | 1–3 | 130 | 222.14 | 92.14 | 181.6 | 6.77 | 3-4 | 130 | 199.71 | 69.71 | 4–6 | 90 | 109.89 | 19.89 |
| C | 1-2 | 130 | 289.93 | 159.93 | 244.2 | 10.41 | 2–4 | 65 | 104.54 | 39.54 | 2–6 | 65 | 109.80 | 44.80 |
|
|