Research Article
A Novel Hybrid Method for Short-Term Power Load Forecasting
Table 5
The error of power load forecasting using different methods based on daily observation.
| ā | Hybrid method | LSSVM | BPNN | WEEMD-LSSVM | GA-LSSVM | EEMD-LSSVM |
| MAE (MW) | 1441.263 | 13343.236 | 16027.205 | 5023.101 | 10623.505 | 10729.767 | MAPE (%) | 0.389 | 3.488 | 4.146 | 1.313 | 2.749 | 2.854 | RMSE (MW) | 1845.988 | 17460.604 | 22325.684 | 6561.656 | 14855.986 | 13914.859 |
|
|