Research Article
Implementation of Optimal Protection Coordination for Microgrids with Distributed Generations Using Quaternary Protection Scheme
Table 7
Directional primary and backup relay operating times for conventional scheme in grid-connected microgrid.
| DG operating status | Fault location | Operating times (t) of relay in second (Rp = primary relay; Rb = backup relay) | Rp | Rb1 | Rb2 |
| Status 1 | F-1 | R1 | R5 | R3 | 0.278 | 0.489 | 0.577 | R2 | R4 | R6 | 0.129 | 0.349 | 0.446 | F-2 | R3 | R1 | R5 | 0.200 | 0.415 | 0.514 | R4 | R6 | R2 | 0.259 | 0.471 | 0.499 | F-3 | R5 | R3 | R1 | 0.338 | 0.548 | 1.236 | R6 | R2 | R4 | 0.272 | 0.580 | 0.799 |
| Status 2 | F-1 | R1 | R5 | R3 | 0.278 | 0.546 | 0.586 | R2 | R4 | R6 | 0.133 | 0.369 | 0.509 | F-2 | R3 | R1 | R5 | 0.202 | 0.420 | 0.484 | R4 | R6 | R2 | 0.259 | 0.439 | 0.591 | F-3 | R5 | R3 | R1 | 0.338 | 0.550 | 1.048 | R6 | R2 | R4 | 0.274 | 0.522 | 0.636 |
| Status 3 | F-1 | R1 | R5 | R3 | 0.278 | 0.493 | 0.602 | R2 | R4 | R6 | 0.142 | 0.360 | 0.397 | F-2 | R3 | R1 | R5 | 0.226 | 0.480 | 0.833 | R4 | R6 | R2 | 0.259 | 0.649 | 0.679 | F-3 | R5 | R3 | R1 | 0.338 | 0.553 | 0.812 | R6 | R2 | R4 | 0.309 | 0.525 | 0.788 |
|
|