Research Article

Implementation of Optimal Protection Coordination for Microgrids with Distributed Generations Using Quaternary Protection Scheme

Table 7

Directional primary and backup relay operating times for conventional scheme in grid-connected microgrid.

DG operating statusFault locationOperating times (t) of relay in second
(Rp = primary relay; Rb = backup relay)
RpRb1Rb2

Status 1F-1R1R5R3
0.2780.4890.577
R2R4R6
0.1290.3490.446
F-2R3R1R5
0.2000.4150.514
R4R6R2
0.2590.4710.499
F-3R5R3R1
0.3380.5481.236
R6R2R4
0.2720.5800.799

Status 2F-1R1R5R3
0.2780.5460.586
R2R4R6
0.1330.3690.509
F-2R3R1R5
0.2020.4200.484
R4R6R2
0.2590.4390.591
F-3R5R3R1
0.3380.5501.048
R6R2R4
0.2740.5220.636

Status 3F-1R1R5R3
0.2780.4930.602
R2R4R6
0.1420.3600.397
F-2R3R1R5
0.2260.4800.833
R4R6R2
0.2590.6490.679
F-3R5R3R1
0.3380.5530.812
R6R2R4
0.3090.5250.788