Research Article
Rolling Scheduling Method considering Shiftable Demand Respond Resources
Figure 4
Intraday scheduling results of the next 2 hours: (a) forecasted wind power; (b) whole-horizon intraday scheduling; (c) next 2-hour intraday scheduling without considering the whole horizon.
(a) |
(b) |
(c) |