Research Article

Rolling Scheduling Method considering Shiftable Demand Respond Resources

Figure 4

Intraday scheduling results of the next 2 hours: (a) forecasted wind power; (b) whole-horizon intraday scheduling; (c) next 2-hour intraday scheduling without considering the whole horizon.
(a)
(b)
(c)