Techno-Economic Comparisons of HVAC and Simultaneous AC-DC Transmission
Table 4
Compensation cost required.
| S/n | Compensation payment route | Total cost (Birr) |
| 1 | Tana Beles-Bahir Dar | 7,014,625.58 | 2 | Bahir Dar-Debre Markos | 12,058,020.3 | 3 | Debre Markos-Sululta | 15,724,711.8 | Total cost (Birr) | 34,797,357.68 | Total cost (USD) (1$ = 40.098 (detailing 180 days of USD to ETB historical data from 19/11/2020 to 16/05/2021)) | 867,807.81 |
|
|