Overcapacity as a Barrier to Renewable Energy Deployment: The Spanish Case
Table 1
Installed power capacity and maximum peak power demand coverage.
| | Installed power capacity as of 31 December 2013 (102 GW) | Coverage of maximum peak power demand 38.7 GW in 2014 |
| Combined cycle | 24.8 | 7% | Coal | 10.7 | 2.5% | Nuclear | 7.7 | 18.9% | Fuel/gas | 0.5 | 0% | Cogeneration and others | 7 | 10.8% | Hydro | 19.5 | 24% | Wind | 22.3 | 34.5% | Solar PV | 4.3 | 0.1% | Solar thermoelectric | 2.2 | 0.1% | Renewable thermal | 1 | 1.5% | Importer balance regarding international exchanges | — | 0.6% |
|
|
Source: Red Eléctrica de España [3]. Pumped storage not included.
|