Overcapacity as a Barrier to Renewable Energy Deployment: The Spanish Case

Table 1

Installed power capacity and maximum peak power demand coverage.

Installed power capacity as of 31 December 2013 (102 GW)Coverage of maximum peak power demand 38.7 GW in 2014

Combined cycle24.87%
Coal10.72.5%
Nuclear7.718.9%
Fuel/gas0.50%
Cogeneration and others 710.8%
Hydro19.524%
Wind22.334.5%
Solar PV4.30.1%
Solar thermoelectric2.20.1%
Renewable thermal11.5%
Importer balance regarding international exchanges0.6%

Source: Red Eléctrica de España [3].
Pumped storage not included.