Overcapacity as a Barrier to Renewable Energy Deployment: The Spanish Case
Table 2
Objectives for RES-E in the two renewable energy plans (1999 and 2005).
| | Objectives for 2010 | | PFER (1999) | PER (2005) |
| Small hydro (<10 MW) | 2230 | 13521 | Hydro (between 10 MW and 50 MW) | 3151 | 3257 | Large hydro (>50 MW) | 13420 | 2199 | Wind | 8974 | 20155 | Biomass | 1897 | 1317 | Cocombustion (biomass) | 722 | Biogas | 78 | 235 | Solar PV | 144 | 400 | Solar thermoelectric | 200 | 500 | Urban solid wastes | 262 | 189 |
| Total electricity | 30355 | 42494 |
|
|