AHP-FSE-Based Risk Assessment and Mitigation for Slurry Balancing Shield Tunnel Construction

Table 1

Construction stage division and content of slurry balancing shield.

Stage divisionOverviewMain construction operation content

Stage IPreconstruction preparation(1) Site preparation. Construction site, living and production facilities, and pipeline relocation
(2) Technical preparation. Construction organization and scheme, and pile measurement
(3) Human, machine, and material preparation. Construction team, facility inspection, and materials inspection

Stage IIWorking well and shield preparation(1) Enclosure, drainage, and support for working well
(2) Shield-related preparation shield machine transportation, pipe transportation, and slurry separation field

Stage IIIShield constructionShield machine installation, test tunneling, and normal operation

Stage IVInternal and auxiliary structure(1) Inner structure
(2) Mechanical and electrical
(3) Accessory structure

Stage VClean and recoveryInternal structure cleaning, site cleaning, traffic, and greening restoration