Table 2

Earthwork quantities of the project.

Serial numberProject nameDredging quantityBackfilling quantity of plain soilPlanting soil engineering quantity

1Shallow water18.322.769.2
Area/depth9.2/39.2/2.69.2/2
2Area/depth69/317.7/1.76
Water to land195.66
3Area/depth55.8/3.6
Present situation16.39