Research Article
[Retracted] Protection-Oriented Landscape Design Based on Ecological Priority under the Concept of Ecological Environment Monitoring
Table 2
Earthwork quantities of the project.
| Serial number | Project name | Dredging quantity | Backfilling quantity of plain soil | Planting soil engineering quantity |
| 1 | Shallow water | 18.3 | 22.76 | 9.2 | Area/depth | 9.2/3 | 9.2/2.6 | 9.2/2 | 2 | Area/depth | 69/3 | 17.7/1.76 | — | Water to land | — | 195.66 | — | 3 | Area/depth | — | 55.8/3.6 | — | Present situation | — | 16.39 | — |
|
|