Research Article

Evaluation of Airborne Asbestos Concentrations Associated with the Operation and Maintenance of Brakes and Clutches on Nonautomated Heavy Equipment

Table 3

Personal and area task-based samples during brake and clutch work, crane operation, and clothes handling. Brake and clutch repair tasks are listed in the order they were performed.

ActivityTasksSample typeDuration (min)Volume (L)PCM—fiber concentration (f/cc)PCME—chrysotile concentration (f/cc)

Clutch and brake work—day 1
 Crane 22B- clutch replacementRemoved clutch band from crane (loosened rusted bolts with pneumatic impact tool)PersonalA2003910.0180.013
1983880.0280.022
 Crane 22B- clutch replacementRemoved clutch band linings at workbench (removed rivets with electric grinder, punch, and hammer); cleaned clutch band surface with electric wire brush; blew off debris with compressed air; painted metal band; cut bulk samples from 2 liningsPersonal38760.0770.036
Area (1.5 m)35180<0.015
 Crane 22B- clutch replacementInstalled new linings on clutch band using rivets at workbenchPersonal3672<0.0375
Area (1.5 m)41211<0.0128
 Crane 22B- clutch replacementBegan installing clutch band with new linings on cranePersonal72143<0.0189
AreaB (21.3 m)113580<0.0047
 CleanupSwept up debris from work bench, 22B crane, and floor around the workbench and cranePersonal3060<0.0450
AreaB (21.3 m)113580<0.0047

Clutch and brake work—day 2
 Crane 22B- clutch and brake workFinished installing clutch band and then removed brake bands from crane (tightened bolts with pneumatic impact tool)Personal1513010.0320.029
Area (21.3 m)97C492<0.0055
 Crane 22B-brake replacementRemoved brake band linings at workbench (removed rivets with electric grinder, punch, and hammer)Personal31620.0590.041
Area (1.5 m)32156<0.0173
 Crane 22B- brake replacementCleaned brake band surfaces by pneumatic sanding at workbench; blew off debris with compressed air; painted metal bandsPersonal2856<0.0482
Area (1.5 m)27139<0.0194
 Crane 22B- brake replacementInstalled new linings on brake bands using rivets at workbenchPersonal3162<0.0435
Area (1.5 m)26123<0.0219
 Crane 22B- brake replacementContinued installing new linings on brake bands using rivets at workbenchPersonal2550<0.0539
Area (1.5 m)31161<0.0168
 Crane 22B- brake replacementInstalled brake bands with new linings on cranePersonal981950.0500.044
Area (21.3 m)42D203<0.0133
 Additional maintenance tasks at workbenchETask #1: blew off a set of used 22B brake linings (1 min 19 sec) and a set of used 15B brake linings (38 sec) that were still on their bands with compressed airPersonal31620.1860.186
Area (1.5 m)311500.0850.085
 Additional maintenance tasks at workbenchETask #2: blew off used 22B clutch linings that were previously sanded with pneumatic sander (1 min 22 sec) and a set of used 15B clutch linings (53 sec) that were still on their bands with compressed airPersonal29570.1550.141
Area (1.5 m)301560.0870.082
 CleanupSwept up debris from work bench, 22B crane, and floor around the workbench and cranePersonal31620.0590.000
Area (1.5, 21.3 m)F331590.0510.051
Clutch and brake work—day 3
 Additional maintenance tasks at workbenchETask #3: ground off rivet heads on a set of 22B brake bands with electric grinder; hand-sanded the linings while still on their bands (about 4 min); blew off debris with compressed air (about 1 min)Personal32640.2380.238
Area (1.5 m)271360.0220.018
 Additional maintenance tasks at workbenchETask #4: removed rivets on 22B brake bands with punch and hammer; removed linings; cleaned brake bands using electric wire brush; blew off debris with compressed air; painted metal brake bandsPersonal14280.1400.140
Area (1.5 m)1158<0.0465
 Additional maintenance tasks at workbenchETask #5: cleaned a set of used 22B brake linings that were still on their bands with electric wire brush (about 2 min)Personal30600.2040.189
Area (1.5 m)301580.0370.037
 Additional maintenance tasks at workbenchETask #6: installed woven brake linings on 22B brake band-cut lining to length with hacksaw (about 15 sec); used pneumatic drill to make approximately 30 rivet holes and countersink linings; blew debris from holes with compressed air; attached woven linings to brake band with rivets.Personal601180.2600.260
Area (1.5 m)613200.0400.040
 Crane 15B- brake and clutch workRemoved brake and clutch bands from cranePersonal108G2160.0240.020
Area (18.3 m)1296800.0070.003
 Crane 15B- clutch workRemoved linings from clutch band at workbench (removed rivets with punch and hammer); cleaned clutch band surface with pneumatic sander; blew off debris with compressed air; painted metal band.Personal4587<0.031
Area (1.5 m)43223<0.0121
 Crane 15B- clutch workInstalled new linings on clutch band at workbench (used pneumatic drill to widen about 50 holes in lining and band to fit existing rivets)Personal44870.0480.039
Area (1.5 m)43222<0.0122
 CleanupSwept up debris from work bench, 15B crane, and floor around the workbench and craneHArea (1.5, 18.3 m)F31159<0.017

Crane operation—day 3
 Crane operationCrane operation including swiveling crane and boom, raising and lowering bucket, and scooping motions with bucket (30 min active operation, with engine idle the remaining time)Personal (L&R lapels)361420.0210.010
34135<0.02
Area (2.4 m)35140<0.0193
Area (2.9 m)38152<0.0177

Clothes-handling—day 3
 Clothes handlingHandling and shake-out of the three sets of coveralls worn by the mechanic during brake and clutch work on the cranes; approximately the last 2 minutes comprised sweeping upPersonal (L&R lapels)151500.0950.000
151500.0790.0044
 After clothes handlingSamples collected at breathing zone height where the laundry handler was standing; sampling occurred immediately following clothes handlingArea (same location where clothes handler was standing)15154<0.0175
15154<0.0175

AThese two samples were also reported on Table 2 since the task duration spanned approximately half the shift. Both samples were collected on the right lapel of the mechanic. No area samples were collected 1.5 m from the workbench during this task. BThis area sample spanned the last two consecutive tasks performed on day 1, and thus the results for this sample are listed twice. The area sampler was approximately 21.3 m from the 22B crane and 1.5 m from the workbench. Except for a few minutes spent cleaning the workbench, the mechanic was working at the crane. CThis area sample was started 57 minutes after the personal sample. DThis area sample was stopped 52 minutes before the personal sample. EThe activity “Additional Maintenance Tasks at Bench” refers to work performed at the workbench with brake and clutch linings that were already removed from cranes before the study started. FWhen the mechanic was cleaning up at the bench, he was approximately 1.5 m from the area sampler, whereas when he was cleaning up at the 22B or 15B crane he was approximately 21.3 or 18.3 m, respectively, from the area sampler. GThis personal sample was started 21 minutes after the area sample. HA personal sample was also collected for this task, but the sampling pump shut off prior to the completion of the sampling period, thus the concentration is uncertain.