Activity | Tasks | Sample type | Duration (min) | Volume (L) | PCM—fiber concentration (f/cc) | PCME—chrysotile concentration (f/cc) |
|
Clutch and brake work—day 1 |
Crane 22B- clutch replacement | Removed clutch band from crane (loosened rusted bolts with pneumatic impact tool) | PersonalA | 200 | 391 | 0.018 | 0.013 |
198 | 388 | 0.028 | 0.022 |
Crane 22B- clutch replacement | Removed clutch band linings at workbench (removed rivets with electric grinder, punch, and hammer); cleaned clutch band surface with electric wire brush; blew off debris with compressed air; painted metal band; cut bulk samples from 2 linings | Personal | 38 | 76 | 0.077 | 0.036 |
Area (1.5 m) | 35 | 180 | <0.015 | — |
Crane 22B- clutch replacement | Installed new linings on clutch band using rivets at workbench | Personal | 36 | 72 | <0.0375 | — |
Area (1.5 m) | 41 | 211 | <0.0128 | — |
Crane 22B- clutch replacement | Began installing clutch band with new linings on crane | Personal | 72 | 143 | <0.0189 | — |
AreaB (21.3 m) | 113 | 580 | <0.0047 | — |
Cleanup | Swept up debris from work bench, 22B crane, and floor around the workbench and crane | Personal | 30 | 60 | <0.0450 | — |
AreaB (21.3 m) | 113 | 580 | <0.0047 | — |
|
Clutch and brake work—day 2 |
Crane 22B- clutch and brake work | Finished installing clutch band and then removed brake bands from crane (tightened bolts with pneumatic impact tool) | Personal | 151 | 301 | 0.032 | 0.029 |
Area (21.3 m) | 97C | 492 | <0.0055 | — |
Crane 22B-brake replacement | Removed brake band linings at workbench (removed rivets with electric grinder, punch, and hammer) | Personal | 31 | 62 | 0.059 | 0.041 |
Area (1.5 m) | 32 | 156 | <0.0173 | — |
Crane 22B- brake replacement | Cleaned brake band surfaces by pneumatic sanding at workbench; blew off debris with compressed air; painted metal bands | Personal | 28 | 56 | <0.0482 | — |
Area (1.5 m) | 27 | 139 | <0.0194 | — |
Crane 22B- brake replacement | Installed new linings on brake bands using rivets at workbench | Personal | 31 | 62 | <0.0435 | — |
Area (1.5 m) | 26 | 123 | <0.0219 | — |
Crane 22B- brake replacement | Continued installing new linings on brake bands using rivets at workbench | Personal | 25 | 50 | <0.0539 | — |
Area (1.5 m) | 31 | 161 | <0.0168 | — |
Crane 22B- brake replacement | Installed brake bands with new linings on crane | Personal | 98 | 195 | 0.050 | 0.044 |
Area (21.3 m) | 42D | 203 | <0.0133 | — |
Additional maintenance tasks at workbenchE | Task #1: blew off a set of used 22B brake linings (1 min 19 sec) and a set of used 15B brake linings (38 sec) that were still on their bands with compressed air | Personal | 31 | 62 | 0.186 | 0.186 |
Area (1.5 m) | 31 | 150 | 0.085 | 0.085 |
Additional maintenance tasks at workbenchE | Task #2: blew off used 22B clutch linings that were previously sanded with pneumatic sander (1 min 22 sec) and a set of used 15B clutch linings (53 sec) that were still on their bands with compressed air | Personal | 29 | 57 | 0.155 | 0.141 |
Area (1.5 m) | 30 | 156 | 0.087 | 0.082 |
Cleanup | Swept up debris from work bench, 22B crane, and floor around the workbench and crane | Personal | 31 | 62 | 0.059 | 0.000 |
Area (1.5, 21.3 m)F | 33 | 159 | 0.051 | 0.051 |
Clutch and brake work—day 3 |
Additional maintenance tasks at workbenchE | Task #3: ground off rivet heads on a set of 22B brake bands with electric grinder; hand-sanded the linings while still on their bands (about 4 min); blew off debris with compressed air (about 1 min) | Personal | 32 | 64 | 0.238 | 0.238 |
Area (1.5 m) | 27 | 136 | 0.022 | 0.018 |
Additional maintenance tasks at workbenchE | Task #4: removed rivets on 22B brake bands with punch and hammer; removed linings; cleaned brake bands using electric wire brush; blew off debris with compressed air; painted metal brake bands | Personal | 14 | 28 | 0.140 | 0.140 |
Area (1.5 m) | 11 | 58 | <0.0465 | — |
Additional maintenance tasks at workbenchE | Task #5: cleaned a set of used 22B brake linings that were still on their bands with electric wire brush (about 2 min) | Personal | 30 | 60 | 0.204 | 0.189 |
Area (1.5 m) | 30 | 158 | 0.037 | 0.037 |
Additional maintenance tasks at workbenchE | Task #6: installed woven brake linings on 22B brake band-cut lining to length with hacksaw (about 15 sec); used pneumatic drill to make approximately 30 rivet holes and countersink linings; blew debris from holes with compressed air; attached woven linings to brake band with rivets. | Personal | 60 | 118 | 0.260 | 0.260 |
Area (1.5 m) | 61 | 320 | 0.040 | 0.040 |
Crane 15B- brake and clutch work | Removed brake and clutch bands from crane | Personal | 108G | 216 | 0.024 | 0.020 |
Area (18.3 m) | 129 | 680 | 0.007 | 0.003 |
Crane 15B- clutch work | Removed linings from clutch band at workbench (removed rivets with punch and hammer); cleaned clutch band surface with pneumatic sander; blew off debris with compressed air; painted metal band. | Personal | 45 | 87 | <0.031 | — |
Area (1.5 m) | 43 | 223 | <0.0121 | — |
Crane 15B- clutch work | Installed new linings on clutch band at workbench (used pneumatic drill to widen about 50 holes in lining and band to fit existing rivets) | Personal | 44 | 87 | 0.048 | 0.039 |
Area (1.5 m) | 43 | 222 | <0.0122 | — |
Cleanup | Swept up debris from work bench, 15B crane, and floor around the workbench and craneH | Area (1.5, 18.3 m)F | 31 | 159 | <0.017 | — |
|
Crane operation—day 3 |
Crane operation | Crane operation including swiveling crane and boom, raising and lowering bucket, and scooping motions with bucket (30 min active operation, with engine idle the remaining time) | Personal (L&R lapels) | 36 | 142 | 0.021 | 0.010 |
34 | 135 | <0.02 | — |
Area (2.4 m) | 35 | 140 | <0.0193 | — |
Area (2.9 m) | 38 | 152 | <0.0177 | — |
|
Clothes-handling—day 3 |
Clothes handling | Handling and shake-out of the three sets of coveralls worn by the mechanic during brake and clutch work on the cranes; approximately the last 2 minutes comprised sweeping up | Personal (L&R lapels) | 15 | 150 | 0.095 | 0.000 |
15 | 150 | 0.079 | 0.0044 |
After clothes handling | Samples collected at breathing zone height where the laundry handler was standing; sampling occurred immediately following clothes handling | Area (same location where clothes handler was standing) | 15 | 154 | <0.0175 | — |
15 | 154 | <0.0175 | — |
|