Research Article

Computed Tomography Scanner Productivity and Entry-Level Models in the Global Market

Table 1

Average and standard deviation (sd) of measured times in CT exam stages, stage percentage contribution (pc), total exam times, and theoretical maximum weekly exam productivities. Times in minutes () and seconds ().

Exam stageSingle-slice (all)Single-slice (modern)Dual-slice4-slice16-slice128-slice

ArrivalAverage393420212540ā€”
sd35144924323
pc5.005.5519.6614.267.31

PreparationAverage2091451301213253
sd145104481243159
pc16.5017.137.3013.115.8515.92

PositioningAverage123116150120233138
sd353838143149134
pc10.6412.4016.8513.1127.9729.43

Data entryAverage1091081131345640
sd4144301132219
pc8.8511.0911.6615.2510.2412.01

Image acquisitionAverage53832720523124144
sd4351303112411132
pc43.3333.7717.5624.7529.4313.21

Patient departureAverage202203312159145138
sd5810513612411425
pc15.6420.0726.9719.5119.2029.43

TotalAverage1300101311521010907533
sd534252256511408445

Productivityā€‰304387333389434713