Research Article
Facility Layout Planning with SHELL and Fuzzy AHP Method Based on Human Reliability for Operating Theatre
Table 16
The weights of the two plans.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
WA1 = 0.0535 0 + 0.1062 1 + 0.0934 0.0180 + 0.2513 0.1435 + 0.0687 0.5731 + 0.1197 0.1829 + 0.2449 0.3033 + 0.0623 0.4253 = 0.306. WA2 = 0.05351 + 0.10620 + 0.09340.9820 + 0.25130.8565 + 0.0687 + 0.4269 + 0.11970.8171 + 0.24490.6967 + 0.06230.5747 = 0.694. |