Construction classification and engineering application of new tunnels adjacent to the existing tunnels.

Engineering applicationsType

When constructing new tunnels in parallel with the existing tunnels and planning new subway linesTunnel side by side
Due to the space conditions, the two tunnels must be built on top of each otherTunnel overlap
Due to space constraints, the two tunnels must be constructed in a staggered wayTunnel staggered
Pass through the existing tunnel from the upper or lower part of the existing tunnel. It is a transfer node for multiple linesTunnel crossing