Research Article

One-Sided and Two-Sided w-of-w Runs-Rules Schemes: An Overall Performance Perspective and the Unified Run-Length Derivations

Table 2

The transition probability matrices of the 3-of-3 standard and improved runs-rules (SRR and IRR) charts.

Upper one-sidedLower one-sidedNon-side-sensitiveSide-sensitive

SRR

IRR