Research Article

[Retracted] Application of Intelligent Robot Palletizer Technology in the Optimization of High-Speed Train Operation and Simulation Verification

Table 1

Configuration table for the parameters of the simulation scenarios.

Station IDMinimum station operating timeInterstation intervalMinimum interval operating time

Shenyang North Highway Yard1ā€”ā€”
Liouwangtun Line Station119
West Tieling Station124
West Kaiyuan Station138
West Changtu Station145
East Siping Station1510
South Gongzhuling Station169
West Changchun Station1711