Research Article
Optimal Fair Scheduling in S-TDMA Sensor Networks for Monitoring River Plumes
Figure 3
Network with 13 nodes and a corner gateway when node 6 is transmitting. (a) Dark gray: neighbor nodes, light gray: parent (pn) and child (cn) of neighbor nodes. (b) Compatibility matrix.
(a) |
(b) |