Research Article
Quality Assessment of Milling Pavement Surface Using 3D Line Laser Technology
Table 3
Substandard area and substandard milling percentage of blocks.
| Block number | Number of substandard areas | Max area of substandard milling (mm2) | Total substandard area (mm2) | Substandard milling percentage (%) |
| Block 1 | 7 | 65,450 | 112,550 | 18.7 | Block 2 | 4 | 149,400 | 215,050 | 35.8 | Block 3 | 4 | 123,300 | 207,200 | 34.5 | Block 4 | 2 | 300,000 | 5,898,600 | 98.3 |
|
|