Research Article
Integration of Multiband InSAR and Leveling Measurements for Analyzing the Surface Subsidence of Shield Tunneling at Beijing-Zhangzhou High-Speed Railway
Figure 18
Leveling point layout and transverse influence distance: (a) DK13+650 cross-section leveling point layout; (b) DK13+650 transverse influence distance; (c) DK12+300 section leveling point layout; (d) DK12+300 transverse influence distance.
(a) |
(b) |
(c) |
(d) |