Research Article

Integration of Multiband InSAR and Leveling Measurements for Analyzing the Surface Subsidence of Shield Tunneling at Beijing-Zhangzhou High-Speed Railway

Figure 28

Position relation between building A and the middle line of the tunnel and the displacement time series of a PS point on the building.