Research Article
Integration of Multiband InSAR and Leveling Measurements for Analyzing the Surface Subsidence of Shield Tunneling at Beijing-Zhangzhou High-Speed Railway
Figure 32
Position relation between building E and the middle line of tunnel and the deformation time-series of a PS point on the building.