Research Article
Integration of Multiband InSAR and Leveling Measurements for Analyzing the Surface Subsidence of Shield Tunneling at Beijing-Zhangzhou High-Speed Railway
Figure 8
Longitudinal section of shield tunnel (between shield well b and shield well c).