Research Article
Integration of Multiband InSAR and Leveling Measurements for Analyzing the Surface Subsidence of Shield Tunneling at Beijing-Zhangzhou High-Speed Railway
Table 6
Average maximum subsidence velocity lag angle and lag distance parameters of longitudinal section.
|