Research Article
Low-Cost, Low-Energy, Wireless Hydrological Monitoring Platform: Design, Deployment, and Evaluation
Table 3
Verification of the compatibility of the initial energy measurements for the rain gauge device field test results.
| Component | Average current (A) | Duration of an operations cycle (seconds) | Energy consumption/cycle of operation (mWh) | Number of cycles/hour | Energy consumption/110 days (mWh) |
| GSM | 35.16 | 38 | 2.923 | 0.0799 | 616.7 | SD card module | 17.4 | 2.44 | 0.093 | 1 | 245.9 | MCU + passive components | 0.03 | 3,600 | 0.237 | 1 | 625.7 | Total energy consumption/110 days (mWh) | 1488.24 mWh | | |
|
|