Research Article
[Retracted] Environmental Impact Assessment of Production Plant during Construction Period
Table 5
pH of groundwater of manufacturing plant’s location.
| | Test point | 1 | 2 | 3 | 4 | 5 | 6 |
| Groundwater level (m) | 45 | 42 | 48 | 45 | 44 | 45 | Measure value | 7.02 | 6.98 | 6.85 | 7.11 | 7.08 | 7.05 | Standard limit | 6.5-8.5 | Standard index | 0.01 | 0.01 | 0.1 | 0.07 | 0.05 | 0.03 | Over standard rate | 0 | 0 | 0 | 0 | 0 | 0 |
|
|