Research Article
Energy Cost Minimization in Heterogeneous Cellular Networks with Hybrid Energy Supplies
Figure 4
(a) The total energy cost of different traffic periods in one day; (b) the total energy cost in a long operational term of ten days. = 1 and = 0.
(a) |
(b) |