Table of Contents Author Guidelines Submit a Manuscript
Mathematical Problems in Engineering
Volume 2006, Article ID 81950, 30 pages
http://dx.doi.org/10.1155/MPE/2006/81950

Bernoulli serial production lines with quality control devices: Theory and application

Department of Information and Telecommunication Engineering, Ming Chuan University, 5 Deh-Ming Road, Gwei-Shan, Taoyuan 333, Taiwan

Received 8 July 2005; Revised 11 October 2005; Accepted 10 November 2005

Copyright © 2006 Shu-Yin Chiang. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. M.-S. Ban, J.-T. Lim, and D.-J. Park, “Performance analysis of serial production lines with quality inspection machines,” International Journal of System Science, vol. 29, no. 9, pp. 939–951, 1998. View at Google Scholar · View at Zentralblatt MATH
  2. S.-Y. Chiang, C.-T. Kuo, J.-T. Lim, and S. M. Meerkov, “Improvability of assembly systems II: improvability indicators and case study,” Mathematical Problems in Engineering, vol. 6, no. 4, pp. 359–393, 2000. View at Publisher · View at Google Scholar · View at Zentralblatt MATH · View at MathSciNet
  3. S.-Y. Chiang, C.-T. Kuo, J.-T. Lim, and S. M. Meerkov, “Improvability of assembly systems. I. Problem formulation and performance evaluation,” Mathematical Problems in Engineering, vol. 6, no. 4, pp. 321–357, 2000. View at Publisher · View at Google Scholar · View at Zentralblatt MATH · View at MathSciNet
  4. S.-Y. Chiang, C.-T. Kuo, and S. M. Meerkov, “Bottlenecks in Markovian production lines: a systems approach,” IEEE Transactions on Robotics and Automation, vol. 14, no. 2, pp. 352–359, 1998. View at Publisher · View at Google Scholar
  5. S.-Y. Chiang, C.-T. Kuo, and S. M. Meerkov, “DT-bottlenecks in serial production lines: theory and application,” IEEE Transactions on Robotics and Automation, vol. 16, no. 5, pp. 567–580, 2000. View at Publisher · View at Google Scholar
  6. S.-Y. Chiang, C.-T. Kuo, and S. M. Meerkov, “c-bottlenecks in serial production lines: identification and application,” Mathematical Problems in Engineering, vol. 7, no. 6, pp. 543–578, 2001. View at Publisher · View at Google Scholar · View at Zentralblatt MATH · View at MathSciNet
  7. Y. Dallery, R. David, and X.-L. Xie, “Approximate analysis of transfer lines with unreliable machines and finite buffers,” IEEE Transactions on Automatic Control, vol. 34, no. 9, pp. 943–953, 1989. View at Publisher · View at Google Scholar · View at Zentralblatt MATH
  8. E. M. Goldratt and J. Cox, The Goal, North Rivers Press, New York, 1986.
  9. D. Jacobs and S. M. Meerkov, “Asymptotically reliable serial production lines with a quality control system,” Computers & Mathematics with Applications, vol. 21, no. 11-12, pp. 85–90, 1991. View at Publisher · View at Google Scholar · View at Zentralblatt MATH
  10. D. Jacobs and S. M. Meerkov, “A system-theory property of serial production lines: improvability,” International Journal of System Science, vol. 26, no. 4, pp. 755–785, 1995. View at Google Scholar
  11. C.-T. Kuo, J.-T. Lim, and S. M. Meerkov, “Bottlenecks in serial production lines: a system-theoretic approach,” Mathematical Problems in Engineering, vol. 2, no. 3, pp. 233–276, 1996. View at Publisher · View at Google Scholar · View at Zentralblatt MATH
  12. J.-T. Lim, S. M. Meerkov, and F. Top, “Homogeneous, asymptotically reliable serial production lines: theory and a case study,” IEEE Transactions on Automatic Control, vol. 35, no. 5, pp. 524–534, 1990. View at Publisher · View at Google Scholar · View at Zentralblatt MATH · View at MathSciNet
  13. G. Taguchi, System of Experimental Design: Engineering Methods to Optimize Quality and Minimize Cost, UNIPUB/Kraus, Michigan, 1987.