Research Article

Optimal Scheduling of Material Handling Devices in a PCB Production Line: Problem Formulation and a Polynomial Algorithm

Table 3

Average computation times for test instances (s).

ProblemK = 1K = 2K = 3K = 4K = 5

N = 200.010.050.080.100.14
N = 300.050.220.570.901.30
N = 400.130.621.984.116.26
N = 500.281.394.4611.9023.92