Research Article
Stochastic Dynamic Programming Applied to Hydrothermal Power Systems Operation Planning Based on the Convex Hull Algorithm
Table 4
Stage 3 expected costs.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
where xt+1 reservoir storage at the end of stage t (hm3); U water discharge in stage t (hm3); tg1 thermal plant 1 generation (MW-month); tg2 thermal plant 2 generation (MW-month); Uns unsupplied load (MW-month). |