Research Article

Change Point Detection with Robust Control Chart

Table 12

Precision of the estimator when used with -Bar chart for different magnitudes of process change (magnitude of shift, ) based on 10,000 trials. Subgroup size , change point (slash distribution).

Magnitude of shift,

0.03410.05310.0829
0.10570.14440.1798
0.15410.20640.2547
0.18620.25420.3053
0.22250.29370.3547
0.25470.33560.3892
0.28990.36590.4222
0.30380.38910.4482
0.33070.41650.4690
0.35540.43580.4849
0.37870.46180.5094