Research Article

Change Point Detection with Robust Control Chart

Table 2

Simulation result: estimates of expected length, average change point, standard error, average size of confidence set and coverage probability for change point of (normal distribution).

X-Bar chartMedian chartProposed MM chart
Magnitude of shift, Magnitude of shift, Magnitude of shift,

Expected length, E(T) 156.75106.88102.05257.05108.30102.16198.14107.60102.14
100.0099.6099.4799.7099.4999.5799.9099.4299.59
Standard error ( )3.552.042.434.292.602.183.702.762.16
Average size, CS14.005.904.0816.206.694.1315.806.134.29
Coverage probability0.8970.9590.9840.9010.9530.9790.9010.9560.981