Research Article
A Parallel Implementation of Unscheduled Flow Control in Interconnected Power Systems
Table 6
Averaged values for objectives and constraints (population size is 150, iteration number is 150).
| | Path 1 [MW] | Path 2 [MW] | Path 3 [MW] | P
loss [MW] | Q
loss [MVAR] |
| Base case | 92.90 | 46.04 | −101.16 | 408.316 | 5504.18 | Target | 100 | 60 | −100 | | | Test results | 103.3790 | 54.8188 | −95.7833 | 405.3045 | 5492.9 |
| Best fitness | 0.7741 |
|
|