Research Article

Predictor-Corrector Primal-Dual Interior Point Method for Solving Economic Dispatch Problems: A Postoptimization Analysis

Table 5

Comparison of the power generation outputs obtained for the system with 6 generators.

Generated powerHGAPCPDIPLS

(MW)20,136717,3659617,36596
(MW)14,864510,0000010,00000
(MW)72,400861,34066761,340667
(MW)72,400877,9748777,97487
(MW)180,0617177,81828177,81828
(MW)139,5865155,500216155,500216
(MW)500,0000500,0000500,0000