Radial Basis Function Neural Network Application to Measurement and Control of Shunt Reactor Overvoltages Based on Analytical Rules

Table 3

Case 1, some sample testing data and output.

𝑉 L L S R 𝑉 P S B 𝑉 R B F e r r o r 𝑉 𝑇 P S B 𝑇 R B F e r r o r 𝑇

1.1516158251.58441.55012.16720.24070.24863.2816
1.1621170251.61621.60440.73140.29150.28781.2762
1.2491194631.71041.76973.46940.40420.38514.7228
1.2491194401.75671.73391.29510.45290.46372.3751
1.3318210781.89751.80604.82160.53740.55222.7495
1.3518226102.06492.12352.83570.68350.66013.4293
1.4303235552.21432.25241.72240.76510.75291.5907
1.4458245372.30962.32960.86390.91690.89062.8659

𝑉 : voltage at reactor bus before switching (p.u.), L L: line length (km), S R: shunt reactor capacity (MVAR), e r r o r 𝑉 : voltage error (%), and e r r o r 𝑇 : duration time error (%).