Research Article

Radial Basis Function Neural Network Application to Measurement and Control of Shunt Reactor Overvoltages Based on Analytical Rules

Table 4

Case 2, some sample testing data and output.

𝑉 L L S R 𝑉 P S B 𝑉 R B F e r r o r 𝑉 𝑇 P S B 𝑇 R B F e r r o r 𝑇

1.1442150701.50111.52681.71350.19360.18812.8214
1.1561165451.54531.53560.62810.23750.22684.5184
1.2302178301.67691.61413.74280.34690.35572.5369
1.2514200301.74811.72061.57460.39520.39021.2657
1.3326215231.95071.99552.29740.51040.52142.1624
1.3326215171.99141.92953.11080.55360.56121.3751
1.4165230172.16522.22512.76590.67420.64074.9752
1.4327242102.24792.28111.47820.75930.78092.8395

𝑉 : voltage at reactor bus before switching (p.u.), L L: line length (km), S R: shunt reactor capacity (MVAR), e r r o r 𝑉 : voltage error (%), and e r r o r 𝑇 : duration time error (%).