A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations
Figure 5
The obtained nondominated solutions in the three-dimensional space with different perturbation strengths: (a) perturbation strength 0.15; (b) perturbation strength 0.25; (c) perturbation strength 0.35.