A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations
Table 4
Parameter settings of the 20 generated instances of benchmark.
| Index | N | NC | K | RF | Index | N | NC | K | RF |
| P1 | 20 | 1.8 | 4 | 0.75 | P11 | 30 | 2.5 | 2 | 0.75 | P2 | 20 | 1.8 | 4 | 1 | P12 | 30 | 2.5 | 2 | 1 | P3 | 20 | 2.1 | 4 | 0.75 | P13 | 60 | 1.8 | 4 | 0.75 | P4 | 20 | 2.1 | 4 | 1 | P14 | 60 | 1.8 | 4 | 1 | P5 | 20 | 2.5 | 2 | 0.75 | P15 | 60 | 2.1 | 4 | 0.75 | P6 | 20 | 2.5 | 2 | 1 | P16 | 60 | 2.1 | 4 | 1 | P7 | 30 | 1.8 | 4 | 0.75 | P17 | 60 | 2.5 | 2 | 0.75 | P8 | 30 | 1.8 | 4 | 1 | P18 | 60 | 2.5 | 2 | 1 | P9 | 30 | 2.1 | 4 | 0.75 | P19 | 120 | 1.8 | 4 | 0.75 | P10 | 30 | 2.1 | 4 | 1 | P20 | 120 | 1.8 | 4 | 1 |
|
|