Parameter settings of the 20 generated instances of benchmark.

IndexN NC K RF Index N NC K RF

P1 20 1.8 4 0.75 P11 30 2.5 2 0.75
P2 20 1.8 4 1 P12 30 2.5 2 1
P3 20 2.1 4 0.75 P13 60 1.8 4 0.75
P4 20 2.1 4 1 P14 60 1.8 4 1
P5 20 2.5 2 0.75 P15 60 2.1 4 0.75
P6 20 2.5 2 1 P16 60 2.1 4 1
P7 30 1.8 4 0.75 P17 60 2.5 2 0.75
P8 30 1.8 4 1 P18 60 2.5 2 1
P9 30 2.1 4 0.75 P19 120 1.8 4 0.75
P10 30 2.1 4 1 P20 120 1.8 4 1