Research Article

A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations

Table 7

The mean value and the variance of the set covers and within the scenarios of perturbation strengths 0.15, 0.25, and 0.35, under the same computational time.

St = 0.15 St = 0.25St = 0.35

P0
P1
P2
P3
P4
P5
P6
P7
P8
P9
P10
P11
P12
P13
P14
P15
P16
P17
P18
P19
P20