Research Article

Optimal Location and Sizing of UPQC in Distribution Networks Using Differential Evolution Algorithm

Table 5

Summary results of IEEE 33-bus distribution system.

Load levelLightMediumPeak

Total power loss (kW) B I202.68305.86442.41
A I150.3244.44402.7

CostUPQC year ($)A I182542391251575

Number of under voltage busesB I0714
A I000

Number of over current linesB I002
A I000

Before installation.
After installation.