Research Article

Time Intervals for Maintenance of Offshore Structures Based on Multiobjective Optimization

Figure 8

Pareto front corresponding to the three objective functions and optimal solutions A, B, C, D, E, and F.
125856.fig.008a
(a)
125856.fig.008b
(b)
125856.fig.008c
(c)
125856.fig.008d
(d)