Research Article

Optimal Protection Coordination for Microgrid under Different Operating Modes

Table 5

Relay operating times for bolted three-phase faults in utility-only mode and in grid-connected mode.

Primary relayBack-up relayOperating time (sec)
Utility-only modeGrid-connected mode
PrimaryBackupCTIPrimaryBackupCTI

FCB2Main CB10.2450.4450.20.2150.4150.2
FCB3Main CB10.2450.4450.20.2050.4130.208
LCB4FCB20.1730.3730.20.1520.3520.2
LCB5FCB20.1760.5630.3870.1510.5480.397
LCB6FCB20.0260.8200.7940.0310.7870.756
LCB7FCB30.1730.3730.20.1530.3530.2
LCB8FCB30.1760.5630.3870.1360.5600.424
LCB9FCB30.0260.8200.7940.0280.8500.822
CB10LCB40.011 (0.015)*0.2240.213 (0.209)0.012 (0.015)0.2340.222 (0.219)
CB11LCB50.012 (0.015)0.2280.216 (0.213)0.014 (0.015)0.2360.222 (0.221)
CB12LCB70.011 (0.015)0.2240.213 (0.209)0.012 (0.015)0.2290.217 (0.214)
CB13LCB80.012 (0.015)0.2280.216 (0.213)0.014 (0.015)0.2150.201 (0.200)