Research Article
Scheduling Semiconductor Multihead Testers Using Metaheuristic Techniques Embedded with Lot-Specific and Configuration-Specific Information
Table 3
Steps of the heuristic grouping method.
| Step | | | 1st in | | |
| 1 | | | 1 | | | Description: generate T and H | 2 | | | 2 | 1 | | Description: put lot 1 onto the test head | 3 | | | 5 | 1 | | Description: select lots 2 and 4 from and put onto the test head | 4 | | | 6 | 5 | | Description: lot 1 finishes testing; then select lot 5 for testing from . | 5 | 3 | 3 | 3 | 5 | | Description: lot 2 finishes testing; then select lot 6 for testing from . | 6 | | | | 5 | | Description: Lot 4 finishes testing; then select lot 3 for testing from . |
|
|